Two Manitowoc 18000s work together setting a roof truss for Lucas Oil Stadium. A wheeled MAX-ER® attachment is sitting to the side but is not attached to the unit. When attached, MAX-ER is a cost-effective way to increase the 18000’s base capacity to 816 tons.